Project Management

Project Management

Plan Smarter — Where Know-How Meets Data

Our edge begins before the shovels hit the ground. Because our schedulers are PMP-certified veterans who have built hundreds of New York timelines, we’ve hard-coded agency review gates, union work rules, and local lead-time curves into reusable Primavera P6 and MS Project templates. That means we stand up a fully linked WBS and two-week look-ahead engine in hours, not weeks. Built-in RFP/RFQ generators pull from a 2,000-item scope library, so bid packages go out 30 % faster and land with iron-clad scope clarity—giving our clients a head start others simply can’t match.


Build Faster — Field Control Powered by Experience

Once work begins, our site teams tap the same tools they helped design: live look-ahead schedules synced to Procore, RFI trackers tied directly to specialty-trade dashboards, and procurement logs that auto-flag long-lead risks. But software is only half the story. Our superintendents have logged thousands of hours inside DOB inspections, NYSDOT night closures, and NYCSCA school turnovers; they know how to resequence work around real-world constraints before the critical path feels a bump. The result is a proven ability to absorb late design tweaks or material delays without surrendering float—often shaving 10–15 % off baseline durations compared with industry averages.


Deliver Better — Close-Out Without Drag

Hand-off is where most projects stall, so we engineered a finish-line playbook that pairs earned-value analytics with field-verified punch-list apps. Every as-built, O&M manual, and commissioning sheet is pre-mapped to schedule activities; as tasks hit 95 % complete, the paperwork populates automatically, letting our teams secure CO sign-offs days after substantial completion instead of weeks. Because we embed point-cloud scans and asset tags directly into the final Revit model, owners get a facilities-ready digital twin—not just a PDF stack—cutting their first-year FM calls in half. Faster turnover, cleaner documentation, fewer callbacks: that’s how we convert schedule certainty into lasting client value.

From Day One to Done—our schedules keep every project moving.